We carried out disposal operations and replacement of the factory roofing with the simultaneous installation of a photovoltaic system sized at 44.00 kWp, composed of high-efficiency photovoltaic panels and string inverters for converting the energy produced.
The goal of the project was the installation of a photovoltaic system for self-consumption that meets the annual energy needs and rewards our brand for its high specialization in airport technologies.
The support of the European Union financed the project within the framework of the POR FESR 2014-2020 program (Axis 4 – Action 4.2.1).